Exceeded Expectations & Production Numbers

“We had a great experience working with Descon. They were very detailed from the initial engineered layout and planning to ensure a successful installation. The project included removing the old equipment, integrating the new equipment with the existing equipment and infrastructure. The installation timeline for the entire project was 2 weeks. Upon startup, the line was able to exceed the expected production numbers. There was open communication and collaboration between both of our teams. Descon listened to our needs and delivered on their promises. Great work!”